je.st
news
Burnside Bridge inspection will require daytime lane closure through Oct. 16
2015-10-14 23:40:34| PortlandOnline
An inspection of the Burnside Bridge will require one traffic lane to be closed on the bridge at times through Friday, October 16. The closed lane will not be in the peak travel direction. The lane closure will typically be between 7 am and 3:30 pm. When the outside lane is closed for the inspection truck, the bike lane will be re-routed into the closed traffic lane with traffic cones. The inspection will gather information for a rehabilitation project scheduled for construction in 2017-2018.
Tags: oct
require
bridge
lane
Category:Construction and Maintenance
Latest from this category |
All news |
||
|