Home Evraz Steel ordered to remove contaminated soil along Willamette River bank
 

Keywords :   


Evraz Steel ordered to remove contaminated soil along Willamette River bank

2014-12-04 00:21:05| Waste Management - Topix.net

The Oregon Department of Environmental Quality will require Evraz Oregon Steel Mills to remove contaminated soil along the Willamette River bank near its North Portland plant. DEQ announced Evraz must dig down one to five feet below the surface to remove soil contaminated with PCBs and metals, and cover the site with river rock.

Tags: remove bank river steel

Category:Energy and Environment

Latest from this category

All news

02.07Greyparrot and VAN DYK Bring AI to MRFs Across the U.S.
02.07Grove Collaborative Announces New Sustainability Goals, Recommits to Moving the Industry Beyond Plastic
02.07Aldi Chops Off Pineapple Crowns in a New Trial to Save 1,400 Tonnes of Food Waste
02.07Virginia Waste-to-Energy Plant Closes, Waste Now Heading for Landfill That is Running Out of Space
02.07Trashion Puts Upcycling in the Spotlight at WasteExpo 2024
01.07Heil Continues Growth of Nationwide Dealer Network With New Locations in Ohio and Michigan
01.07Heil Expands Nationwide Dealer Network With New Facility, Servicing Iowa and Nebraska
01.07Heil Strengthens Nationwide Dealer Network With New Locations in Wisconsin and Minnesota
Energy and Environment »
03.07Hurricane Beryl Graphics
03.07Hurricane Beryl Public Advisory Number 18A
03.07Summary for Hurricane Beryl (AT2/AL022024)
03.07Eastern North Pacific Tropical Weather Outlook
03.07Atlantic Tropical Weather Outlook
03.07Benefits of benchmarking in the pork industry
03.07Hurricane Beryl Graphics
03.07Hurricane Beryl Forecast Discussion Number 18
More »