Home Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety
 

Keywords :   


Weaker Bolts in Arena's Prefabricated Facade Assembly Pose No Threat to Safety

2013-01-09 18:47:33| ENR.com: Headline News

After a discovery that under-strength bolts were installed in error within the prefabricated latticework assemblies of Brooklyns Barclays Center, crews had to replace only 1,768 with the higher-strength bolts originally specified. There are 23,351 bolts in the system.

Tags: to safety assembly threat

Category:Construction and Maintenance

Latest from this category

All news

»
19.05Virgin Trains targets West Coast in return to rail
19.05Cashing In On The Stache
19.05 Dr. Squatch Launches Bronco Bricc
19.05Gillette Venus Announces Ambassadors Ahead of the Olympic and Paralympic Games Paris 2024
19.05Eastern North Pacific Tropical Weather Outlook
19.05Atlantic Tropical Weather Outlook
19.05Eastern North Pacific Tropical Weather Outlook
19.05Atlantic Tropical Weather Outlook
More »