je.st
news
Tag: replacement
SE Division Place and 6th Avenue Sewer Replacement Project Update: July 10, 2015
2015-07-13 22:37:21| PortlandOnline
Environmental Services your sewer and stormwater service provider will replace and upsize about 270 feet of public sewer pipes on SE Division Place between SE 6th and SE 7th avenues. The pipes are between 95 and 106 years old. This project will increase sewer capacity and reduce the risks of sewage releases to homes and streets.
Tags: place
july
project
update
Balch Consolidated Conduit Support Sewer Replacement Project Update
2015-07-09 20:39:53| PortlandOnline
Environmental Service has completed designing a project that will replace and abandon pipes in poor condition and relieve street flooding and basement sewer backups in the area bounded by NW Yeon Avenue, NW 29th Avenue, NW Nicolai Avenue, and NW St. Helens Road. The project includes diverting stormwater to the Balch Consolidation Conduit sewer pipe, and replacing dams in the Balch Outfall pipe to prevent Willamette River water from backing up into the pipe during heavy rain events.
Tags: support
project
update
replacement
Direct Replacement PTAC Air Conditioners for American Standard, Carteret, Chromalox, and Chrysler Equipment Available Through HVAC Brain
2015-07-08 12:31:11| Industrial Newsroom - All News for Today
HVAC Brain, Inc. (www.hvacbrain.com), retailer of HVAC/R equipment and replacement parts, carries a complete line of Islandaire PTAC air conditioners. Islandaire units directly replace models manufactured by American Standard, Carteret, Chromalox, and Chrysler. Islandaire through the wall air conditioners are a...
Tags: through
standard
american
air
N Fremont and Kerby Sewer Replacement Project
2015-07-03 01:20:32| PortlandOnline
Project planning is underway
Tags: project
replacement
sewer
fremont
Balch Consolidated Conduit Support Sewer Replacement Project
2015-07-02 00:16:01| PortlandOnline
Environmental Service has completed designing a project that will replace and abandon pipes in poor condition and relieve street flooding and basement sewer backups in the area bounded by NW Yeon Avenue, NW 29th Avenue, NW Nicolai Avenue, and NW St. Helens Road. The project includes diverting stormwater to the Balch Consolidation Conduit sewer pipe, and replacing dams in the Balch Outfall pipe to prevent Willamette River water from backing up into the pipe during heavy rain events.
Tags: support
project
replacement
consolidated
Sites : [56] [57] [58] [59] [60] [61] [62] [63] [64] [65] [66] [67] [68] [69] [70] [71] [72] [73] [74] [75] next »