Home wheeler
 

Keywords :   


Tag: wheeler

Foster Wheeler Awarded EPCM Contract For Owens Corning Manufacturing Facility In U.S.

2014-07-07 06:54:45| chemicalonline Home Page

Foster Wheeler AG announced recently that a subsidiary of its Global Engineering and Construction Group has been awarded an engineering, procurement and construction management contract by Owens Corning (NYSE:OC) for a new composite materials manufacturing facility in Gastonia, North Carolina

Tags: us contract manufacturing facility

 

Foster Wheeler Awarded Contract For Terrace Wall Steam Reformer Heater In Russia

2014-06-30 10:31:08| chemicalonline Home Page

Foster Wheeler AG announced recently that a subsidiary of its Global Engineering and Construction Group has been awarded a contract by Glencore Oil Projects AG for the engineering and material supply of a steam reformer heater for hydrogen production for the Orsknefteorgsyntez Refinery at Orsk, Russia

Tags: wall contract russia foster

 
 

Foster Wheeler licensee to supply HRSGs for Rabigh II CCPP in Saudi Arabia

2014-06-26 01:00:00| Power Technology

BHI, a licensee of Foster Wheeler's Global Power Group, has received a contract from the Korean construction firm Samsung C&T to design and supply six heat recovery steam generators (HRSGs) for the 2,100MW Rabigh II combined-cycle power plant (CCPP)

Tags: supply foster arabia saudi

 

Foster Wheeler Receives Contract For Retrofit-SCR System In Finland

2014-06-23 08:18:19| chemicalonline News Articles

Foster Wheeler AG announced recently that a subsidiary of its Global Power Group has been awarded a contract by Turun Seudun Energiantuotanto Oy (TSE) for the design, supply and erection of a retrofit-selective catalytic reduction (SCR) system for TSE’s Naantali unit 3 in Finland

Tags: system contract finland foster

 

Foster Wheeler Files Definitive Proxy Materials For Extraordinary General Meeting

2014-06-16 12:42:05| chemicalonline Home Page

Foster Wheeler AG(“Foster Wheeler” or the “Company”) announced today that it has filed with the U.S. Securities and Exchange Commission (“SEC”) definitive proxy materials in connection with its Extraordinary General Meeting (the “EGM”) to be held on July 10, 2014 at the Company’s offices in Baar, Switzerland

Tags: general files meeting materials

 

Sites : [36] [37] [38] [39] [40] [41] [42] [43] [44] [45] [46] [47] [48] [49] [50] [51] [52] [53] [54] [55] next »