Home installed
 

Keywords :   


Tag: installed

Chapter 7: Cured-In-Place Piping (CIPP) Installed in Private Sewer Piping Under or Within an Existing Residential or Commercial Building Envelope -- OPSC/7/#4

2015-03-05 23:11:40| PortlandOnline

PDF Document, 119kbCategory: Uniform Plumbing Code - Chapter 3, 6, 7 & 11

Tags: private existing building commercial

 

Vista System's Specially Designed Double Sided Pylons Were Recently Installed by SPS at Sedibeng Brewery (Pty.) Ltd., in Kliprivier, South Africa

2015-03-04 11:31:15| Industrial Newsroom - All News for Today

Vista System International, a world leader in Modular Curved Frame Technology (MCFT), recently supplied its specially designed large, double sided pylons, to SPS (Signage Production Studio), South Africa, who in turn installed them at the Sedibeng Brewery (Pty.) Ltd. Located in Kliprivier, South Africa. The end...

Tags: designed south systems double

 
 

Gas Management System Installed at North Peace Regional Landfill

2015-03-02 22:33:00| Waste Age

<a href="http://www.alaskahighwaynews.ca/">Alaska Highway News</a> The PRRD board of directors traveled to the North Peace Regional Landfill on Thursday for the commissioning of a gas management system that will convert waste-generated methane into something more useful. read more

Tags: system management north regional

 

Welltec Annular Barrier Installed in First Presalt Deepwater Well for Cementless Completion

2015-02-26 11:31:44| Industrial Newsroom - All News for Today

RIO DE JANEIRO, Brazil  Welltec, the world leader in safe and cost effective well solutions, is pleased to announce that its Welltec Annular Barrier (WAB) has been successfully utilized within a pre-salt reservoir, offshore Brazil. After extensive material, functional and qualification testing, several WAB's...

Tags: installed completion barrier annular

 

Wireless devices will be installed in Denville schools for PARCC tests

2015-02-18 08:58:37| Wireless - Topix.net

The arrival of MR-32 wireless devices and preemptive talks about the 2015-16 school district budget highlighted the Denville Board of Education work session meeting on Monday, Feb. 9. As announced by Board member Dino Cappello, the District received the 30 wireless network MR-32 devices that Superintendent of Schools Steven Forte and Technical Manager Cindy Costanza desired to have installed to enable the District to complete PARCC testing this year. The devices will be set up in classrooms and tested almost immediately, according to the Board.

Tags: schools tests wireless devices

 

Sites : [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] [32] [33] [34] [35] [36] [37] next »