Home requirements
 

Keywords :   


Tag: requirements

BAE Systems awards submarine system requirements contract to Hydro

2014-08-29 01:00:00| Naval Technology

Hydro Group has been awarded a contract by BAE Systems to deliver submarine system requirements for integration onto the UK Royal Navys Successor-class submarines, which will replace the ageing Vanguard-class fleet of nuclear submarines.

Tags: system systems requirements contract

 

Meter Meets Industrial-Class Energy Monitoring Requirements

2014-08-28 19:07:00| Transmission & Distribution World

Leviton has expanded its revenue-grade line of VerifEye submetering solutions with the introduction of its Series 4000 Industrial ModBus Smart Meter. read more

Tags: requirements energy meter monitoring

 
 

HDPE Bottles support changing CPSC requirements.

2014-08-27 14:36:01| Industrial Newsroom - All News for Today

Offering child-resistant packaging option for metered dose nasal pumps, HDPE Bottles have 18 mm ratchet neck finish and are available in both ½ oz and 1 oz sizes. Bottles offer flexibility for pharmaceutical and OTC nasal category as they are compatible with variety of nasal pumps with ratchet systems. Multiple options of metered dose nasal pumps are also available. This story is related to the following:Health, Medical and Dental Supplies and EquipmentSearch for suppliers of: Spray Bottles |

Tags: support requirements changing bottles

 

Manufactured Building Requirements

2014-08-26 13:00:00| Electrical Construction & Maintenance

Article 545 covers requirements for a manufactured building and building components. read more

Tags: building requirements manufactured

 

Watlow® Flange Heaters Comply with ASME's Revised Section IV Requirements

2014-08-26 06:00:00| Industrial Newsroom - All News for Today

Watlow®, an industry leader in the design and manufacture of complete thermal systems, announced that it recently received a Certificate of Conformance from the American Society of Mechanical Engineers (ASME) designating that its flange heaters meet the Boiler and Pressure Vessel Code (BPVC), Section IV revised requirements, and can apply the H stamp to its flange heater assemblies.<br /> <br /> Recently, the ASME revised its BPVC, Section IV, Rules for the Construction of Heating Boilers, ...This story is related to the following:Flanged Heaters

Tags: section requirements revised comply

 

Sites : [149] [150] [151] [152] [153] [154] [155] [156] [157] [158] [159] [160] [161] [162] [163] [164] [165] [166] [167] [168] next »