Home requirements
 

Keywords :   


Tag: requirements

Grounding Electrode Requirements at Separate Building or Structure

2014-05-15 14:38:00| Electrical Construction & Maintenance

The grounding and bonding rules for buildings or structures supplied by a feeder(s) or branch circuit(s) can be found in Sec. 250.32 of the 2011 NEC. Content Classification:  Influencer read more

Tags: building requirements structure separate

 

PXIe Hybrid Chassis meets high power ATE system requirements.

2014-05-08 14:30:25| Industrial Newsroom - All News for Today

Consisting of 4U rugged mainframe with -10 to +55°C temperature range, Model CMX18 features advanced PCIe switch fabric for non-transparent switching and partionable architecture for true deterministic slot-slot communications, allowing multiple test engines to be housed within one mainframe. Built-in health monitoring gives user feedback of temperature, fan speed, and supply line monitoring to minimize MTTR. Designed with 1,000 W power supply, CMX18 operates at 91% power efficiency. This story is related to the following:Electronic Equipment Chassis |

Tags: high system power requirements

 
 

Chrysler to introduce PHEV models in 2016 and 2017 to meet ZEV requirements; new FCA gasoline engine family coming in 2015

2014-05-06 20:31:13| Green Car Congress

Tags: in family meet coming

 

When will my project trigger requirements of the City of Portland Stormwater Management Manual?

2014-05-05 17:23:55| PortlandOnline

Portland was one of the first municipalities in Oregon to develop and enforce specific rules for the treatment and disposal of stormwater. These standards are required to be met whenever your project involves three basic conditions.

Tags: city management project requirements

 

Compact 70-80 GHz Radio meets city environment requirements.

2014-05-05 14:30:29| Industrial Newsroom - All News for Today

Meeting densified urban backhaul environment requirements, WTM 3300 offers up to 1 Gbps capacity and can be installed on lightpoles, sides of buildings, and other locations that must adhere to city regulations and zoning ordinances. Small form factor radio, designed for small cell and macrocell wireless backhaul markets as well as enterprise broadband connectivity, does not require operators to procure separate antennas. This eliminates configuration step and shortens installation period.<br /> This story is related to the following:Radios | Radio Systems

Tags: city radio environment requirements

 

Sites : [164] [165] [166] [167] [168] [169] [170] [171] [172] [173] [174] [175] [176] [177] [178] [179] [180] [181] [182] [183] next »