je.st
news
Tag: meets
More than Meets the Eye when Diagnosing Animal Health Problems
2015-04-15 02:00:00| ThePigSite - Industry News
US - Every day, veterinarians and producers use diagnostic tests as a tool to maintain herd health.
Tags: health
problems
eye
animal
Sound Level Meter meets high-end installation needs.
2015-04-14 14:31:06| Industrial Newsroom - All News for Today
Designed to IEC651 (Type 2) and ANSI S1.4 (Type 2) standards, Sonichek™ Pro accommodates requirements of professional installers working on high-end installations. This sound level meter, used for exacting audio installation checks, offers A- and C- Weighted measurements from 30–130 dB, frequency range from 31.5 Hz to 8 kHz, and accuracy of ±1.5 dB.
Tags: level
sound
installation
meter
Test System meets immunity testing requirements.
2015-04-09 14:31:07| Industrial Newsroom - All News for Today
Combining signal generator and integrated power amplifier, Model NSG 4060 meets requirements for immunity testing to low frequency disturbances in frequency range of 15 Hz to 150 kHz. Disturbances are coupled onto cables in common mode (IEC/EN 61000-4-16) with continuous levels up to 33 V or differential mode (IEC/EN 61000-4-19) with levels up to 22 V/4.5 A. System includes user port for 4 TTL inputs and 4 TTL outputs as well as supply voltages for individual monitoring and control applications.
Tags: system
test
requirements
testing
Free meets regulatory requirement to reduce reliance on roaming
2015-04-07 02:00:00| Total Telecom industry news
France's smallest mobile operator says network reaches 78% of population; aims for 60% 4G coverage by year-end.
Tags: free
reduce
requirement
meets
Kaiduan dam in Borneo meets fierce opposition
2015-04-06 16:48:00| Climate Ark Climate Change & Global Warming Newsfeed
Mongabay: Activists are calling on the government of Sabah, Malaysia, to reconsider the proposed Kaiduan dam, saying the Infrastructure Development Ministry (IDM) has not considered other solutions to Sabah's looming water crisis and has failed to consult with the indigenous people who will be displaced if the project proceeds. The government first proposed building the Kaiduan dam in 2008. The IDM insists the project is necessary to ensure an adequate water supply for the west coast of Sabah, one of the...
Tags: meets
opposition
dam
fierce
Sites : [61] [62] [63] [64] [65] [66] [67] [68] [69] [70] [71] [72] [73] [74] [75] [76] [77] [78] [79] [80] next »