Home Blair Church secures utility relocation design work in Californias Central Valley
 

Keywords :   


Blair Church secures utility relocation design work in Californias Central Valley

2014-02-25 01:00:00| Railway Technology

Clovis-based Blair Church & Flynn Consulting Engineers (BC&F) has secured a contract for utility relocation design work in the Central Valley from the California High-Speed Rail Authority and Tutor-Perini/Zachary/Parsons (TPZP) joint venture (JV).

Tags: work design central valley

Category:Transportation and Logistics

Latest from this category

All news

27.11Atlantic Tropical Weather Outlook
27.11Eastern North Pacific Tropical Weather Outlook
27.11Eastern North Pacific Tropical Weather Outlook
27.11Atlantic Tropical Weather Outlook
27.11Atlantic Tropical Weather Outlook
27.11Eastern North Pacific Tropical Weather Outlook
26.11Atlantic Tropical Weather Outlook
26.11Eastern North Pacific Tropical Weather Outlook
Transportation and Logistics »
27.11Washington Corner | November 2024
27.11
27.11MTG 4
27.1119
27.11
27.11Y-3
27.11
27.1125th PSA10
More »