Home Design work completed for Gold Line operations campus in US
 

Keywords :   


Design work completed for Gold Line operations campus in US

2013-06-11 01:00:00| Railway Technology

The Metro Gold Line Foothill Extension Construction Authority in California, US has completed the design work, 30% of construction and the majority of the underground utility installation as part of the 24-acre, $265m Gold Line Operations Campus.

Tags: us work line design

Category:Transportation and Logistics

Latest from this category

All news

25.11Eastern North Pacific Tropical Weather Outlook
25.11Atlantic Tropical Weather Outlook
24.11Atlantic Tropical Weather Outlook
24.11Eastern North Pacific Tropical Weather Outlook
24.11Atlantic Tropical Weather Outlook
24.11Eastern North Pacific Tropical Weather Outlook
24.11Eastern North Pacific Tropical Weather Outlook
24.11Atlantic Tropical Weather Outlook
Transportation and Logistics »
25.11 24.525.5cm
25.11 B
25.11SHIMANO CS-R8000 14-28t 1
25.11RADWIMPS/
25.11Delegation Delegation
25.11009 19685DVD
25.1124 C2000S
25.11stayc applemusic so bad 1
More »