Home Equinor Extends Oseberg Field Shutdown Into Next Week
 

Keywords :   


Equinor Extends Oseberg Field Shutdown Into Next Week

2019-05-10 19:30:03| OGI

Production at the field was shut on May 8 as a precautionary measure due to problems with fire water pumps at offshore installations, and the shutdown was expected to last for five days, the fields operator Equinor said.

Tags: week field extends shutdown

Category:Industrial Goods and Services

Latest from this category

All news

19.11POWTEX2024 The 25th International Powder Technology Exhibition Tokyo
Industrial Goods and Services »
23.11
23.11 85
23.11DANCEWITHDRAGON2 811
23.11 N5000VSE
23.11EZY POWER EDIT6
23.11RR4
23.1126.5 HG
23.11VISSLA
More »