Home Morrison Bridge closed Sunday, March 20 for lift span work
 

Keywords :   


Morrison Bridge closed Sunday, March 20 for lift span work

2016-03-11 18:30:11| PortlandOnline

The Morrison Bridge will be closed to motor vehicle traffic on Sunday, March 20 from 7 a.m. until as late as 7 p.m. during an inspection and maintenance work on the lift span deck. The work is related to problems with deck panels that were installed in 2011 2012. The bridge will remain open to bicyclists and pedestrians, but there will be delays when the drawbridge is in the open position.

Tags: work march sunday closed

Category:Construction and Maintenance

Latest from this category

All news

»
24.11 Beautiful World CD
24.11VIII
24.11PLUS MADHOUSE( ) 2
24.11KATO 10-1537 415
24.11125f-slim
24.11
24.11olend ona soft bag
24.1110ONKYO
More »