Home Morrison Bridge closed Sunday, May 3 for lift span work
 

Keywords :   


Morrison Bridge closed Sunday, May 3 for lift span work

2015-04-29 20:23:50| PortlandOnline

The Morrison Bridge will be closed to motor vehicle traffic on Sunday, May 3 from 7 a.m. until as late as 7 p.m. during an inspection and maintenance work on the lift span deck. The work is related to problems with deck panels that were installed in 2011 2012. The bridge will remain open to bicyclists and pedestrians during the work.

Tags: work sunday closed bridge

Category:Construction and Maintenance

Latest from this category

All news

»
15.11171
15.11 3FLYOVER
15.11 PSA8 - 1ed
15.11DMC RAVEN 18g
15.11LOVE or DEAD Blu-ray
15.11 HSGI SURE-GRIP PADDED BELT a-tacs au
15.11 BOUNTY HUNTER
15.11
More »