Home Morrison Bridge closed Sunday, November 6 for lift span work
 

Keywords :   


Morrison Bridge closed Sunday, November 6 for lift span work

2016-11-01 20:13:09| PortlandOnline

The Morrison Bridge will be closed to motor vehicle traffic on Sunday, November 6 from 7 a.m. until as late as 7 p.m. during an inspection and maintenance work on the lift span deck. The work is related to problems with deck panels that were installed in 2011 2012. The bridge will remain open to bicyclists and pedestrians, but there will be delays when the drawbridge is in the open position.

Tags: work november sunday closed

Category:Construction and Maintenance

Latest from this category

All news

»
30.06Hurricane Beryl Forecast Discussion Number 7
30.06Hurricane Beryl Graphics
30.06Hurricane Beryl Wind Speed Probabilities Number 7
30.06Hurricane Beryl Public Advisory Number 7
30.06Summary for Hurricane Beryl (AT2/AL022024)
30.06Hurricane Beryl Forecast Advisory Number 7
30.06Atlantic Tropical Weather Outlook
30.06Eastern North Pacific Tropical Weather Outlook
More »