Home Morrison Bridge closed Sunday, November 6 for lift span work
 

Keywords :   


Morrison Bridge closed Sunday, November 6 for lift span work

2016-11-01 20:13:09| PortlandOnline

The Morrison Bridge will be closed to motor vehicle traffic on Sunday, November 6 from 7 a.m. until as late as 7 p.m. during an inspection and maintenance work on the lift span deck. The work is related to problems with deck panels that were installed in 2011 2012. The bridge will remain open to bicyclists and pedestrians, but there will be delays when the drawbridge is in the open position.

Tags: work november sunday closed

Category:Construction and Maintenance

Latest from this category

All news

»
14.11AKB48 1st
14.11kindle 10
14.11
14.11YAMAHA PORTATONE PSR-340
14.112003 112
14.11 14533.5
14.11caligari 17
14.11 amnjx 27circus
More »