Home Pre-Manufactured Drip Edge reduces labor and installation time.
 

Keywords :   


Pre-Manufactured Drip Edge reduces labor and installation time.

2014-05-21 14:30:39| Industrial Newsroom - All News for Today

Available in various face heights, TPO Coated Drip Edge fills industry need for pre-manufactured, heat-weldable edge metal while providing opportunity to eliminate sheet metal fabrication labor. ANSI/SPRI ES-1 tested and Florida building code approved product, manufactured in 12 ft lengths that minimize seams and pieces to handle, features L-shaped, continuous cleat with pre-slotted fastening holes. This facilitates location and installation while also reducing thermal movement failure. This story is related to the following:Drip Edges

Tags: time edge installation labor

Category:Industrial Goods and Services

Latest from this category

All news

19.11POWTEX2024 The 25th International Powder Technology Exhibition Tokyo
Industrial Goods and Services »
24.1120225//
24.112012()
24.11oasis 2022 morning
24.11Bianchi San marco xr3
24.11()
24.11PS2
24.11
24.11 HD DVD BOX
More »