Home Watts Bar Refueling Confirmed Following a 48-Minute Core Verification Using the NM200E System ...
 

Keywords :   


Watts Bar Refueling Confirmed Following a 48-Minute Core Verification Using the NM200E System ...

2014-05-20 06:00:00| Industrial Newsroom - All News for Today

NEAR SPRING CITY, TENNESSEE - It did not take long for the refuel crew at the Watts Bar Nuclear Power Plant to get the positive news near the end of the recent April outage. All 193 fuel assemblies were confirmed to be properly aligned following a routine, 48-minute long precision mapping using a NM200E Core Verification System, manufactured by Newton Labs.<br /> <br /> This was the second time the Newton mapping system has been deployed in this Tennessee Valley Authority (TVA) reactor. The ...This story is related to the following:Assembly Verification Inspection Systems

Tags: system bar core confirmed

Category:Industrial Goods and Services

Latest from this category

All news

19.11POWTEX2024 The 25th International Powder Technology Exhibition Tokyo
Industrial Goods and Services »
24.11S
24.11
24.115
24.11SR
24.11 RC24.4.5
24.11115+128717dz
24.11lavaSUKALA 3
24.11508A
More »