Home stormwater
 

Keywords :   


Tag: stormwater

Capitol Highway Corridor Stormwater Concept Design (March 2016)

2016-05-05 19:58:43| PortlandOnline

(PDF Document, 41.1MB) PDF Document, 43,143kbCategory: Watershed Plans, Studies and Reports

Tags: design march concept highway

 

Capitol Highway Corridor Stormwater Concept Design (March 2016)

2016-05-05 19:54:31| PortlandOnline

(PDF Document, 41.1MB) PDF Document, 43,143kbCategory: Plans, Studies and Reports

Tags: design march concept highway

 
 

Traffic Advisory: SE Milwaukie Ave to be closed again Friday, 8 a.m. to 4 p.m. after PBOT crews find more damage to underground stormwater lines

2016-04-22 22:52:33| PortlandOnline

The Portland Bureau of Transportation advises the traveling public that SE Milwaukie Avenue will be closed at SE Reedway Street from 8 a.m. to 4 p.m. on Friday, April 22 as crews continue to make repairs to broken underground stormwater lines.

Tags: to more find friday

 

Update: Southbound N Interstate lanes closed though 3 p.m. again today near Broadway Bridge for stormwater repairs

2016-04-22 22:49:57| PortlandOnline

UPDATE: Portland Bureau of Transportation crews are closing the southbound Interstate Avenue travel lane and bike lane today from 8 a.m. through as late as 3 p.m. An additional underground cavity was found this morning after work on other stormwater system damage on Thursday.

Tags: today update closed bridge

 

Traffic Advisory: SE Milwaukie Ave to be closed again Friday, 8 a.m. to 4 p.m. after PBOT crews find more damage to underground stormwater lines

2016-04-22 01:56:44| PortlandOnline

Tags: to more find friday

 

Sites : [12] [13] [14] [15] [16] [17] [18] [19] [20] [21] [22] [23] [24] [25] [26] [27] [28] [29] [30] [31] next »