Home Alberta allows Nexen to resume operations for production pipelines at Long Lake project
 

Keywords :   


Alberta allows Nexen to resume operations for production pipelines at Long Lake project

2015-09-18 01:00:00| Hydrocarbons Technology

Nexen Energy has received a second amendment order from the Alberta Energy Regulator (AER) approving the restart of operations for ten production pipelines at the companys Long Lake oil sands oil extraction project.

Tags: long project production operations

Category:Energy and Environment

Latest from this category

All news

14.11
14.115
14.11MTGfoil
14.11
14.11sw14000XH 8000
14.11katie
14.11EX 330 HP SAR
14.11 M1
Energy and Environment »
14.11
14.115
14.11MTGfoil
14.11
14.11sw14000XH 8000
14.11katie
14.11EX 330 HP SAR
14.11 M1
More »