Home Morrison Bridge Saturday closure to install drawbridge parts
 

Keywords :   


Morrison Bridge Saturday closure to install drawbridge parts

2017-11-03 18:26:15| PortlandOnline

The Morrison Bridge will be closed to all traffic on Saturday, November 4 from 6 a.m. until as late as 6 p.m. to allow a contractor to install parts on the drawbridge that were removed during this years repairs.

Tags: parts saturday bridge install

Category:Construction and Maintenance

Latest from this category

All news

»
28.09Eastern North Pacific Tropical Weather Outlook
28.09Atlantic Tropical Weather Outlook
28.09Post-Tropical Cyclone Helene Public Advisory Number 21
28.09Tropical Storm Joyce Public Advisory Number 5
28.09Summary for Tropical Storm Joyce (AT1/AL112024)
28.09Post-Tropical Cyclone Helene Public Advisory Number 21
28.09Tropical Storm Joyce Forecast Discussion Number 5
28.09Tropical Storm Joyce Wind Speed Probabilities Number 5
More »