Home Wärtsilä to provide heavy construction vessel design for Subsea 7
 

Keywords :   


Wärtsilä to provide heavy construction vessel design for Subsea 7

2013-06-10 01:00:00| Ship Technology

Wärtsilä has secured a contract to provide the design for a large heavy construction vessel (HCV) to be built for Subsea 7.

Tags: provide design construction heavy

Category:Transportation and Logistics

Latest from this category

All news

15.11Summary for Tropical Storm Sara (AT4/AL192024)
15.11Tropical Storm Sara Public Advisory Number 5A
15.11Tropical Storm Sara Graphics
15.11Eastern North Pacific Tropical Weather Outlook
15.11Atlantic Tropical Weather Outlook
14.11Summary for Tropical Storm Sara (AT4/AL192024)
14.11Tropical Storm Sara Public Advisory Number 5
14.11Tropical Storm Sara Graphics
Transportation and Logistics »
15.11
15.11 BLOOD &DEATH HISTORY
15.113
15.11 squier Jazzmaster
15.11 SS6
15.11
15.11pen20087
15.11/
More »